Chandler Mechanical Services Limited
Description
Pipe & steel work fabrication for building services systems including Heating, Cooling, Water Supply, Gas, Oil and much more.
Tell your friends
RECENT FACEBOOK POSTS
facebook.comLow Loss Header under construction: "Strong backs" with Steve Reeves💪
Installation of a new steam condensate receiver unit at a major UK hospital. The unit is designed to receive condensate at very high temperatures and in some cases will receive 'flash steam'. Therefore all live connections have been double valved for safety with an additional spare valved connection for future use. The inlet header, connection pieces and outlet header were fabricated off site from 316 stainless steel. The vent and water seal pipe work was fabricated off site from 80mm carbon steel material. Joe Lewis
Bespoke 450mm diameter steam Condensate Recovery Unit (CRU) manufactured at our workshop, delivered to site and installed by us. This CRU was specially made to replace an older, no longer available model that had failed after many years of loyal service. The new unit is fitted with a high temperature magnetic float switch used to control the discharge pumps once the vessel is full. The switch is mounted into a detachable plate that can be easily removed for maintenance purposes and uses standard, readily available gaskets.
Stainless Steel Pipe Work
250mm Chilled Water header pipe work and bracketry fabricated off site at our workshop, delivered and installed on site.
Incoming Gas Installations
Photos from Chandler Mechanical Services Limited's post
Our mobile welding unit in action during the night to complete repairs to a bridge.
Stainless steel pipe fabrication for fresh water and waste water applications with Steve Reeves
Quiz
